American Experience

Compressed Air in the Tunnels

Clip: Season 26 Episode 5 | 2m 42s

Work never stopped on the Pennsylvania Railroad’s tunneling projects; there were three 8-hour shifts a day, 7 days a week. As the workers dug under the river bed, compressed air was pumped in to keep the water out of the tunnels. To bore under the river, the engineers used a Greathead shield, a steel cylinder with a diameter of 23 feet that weighed nearly 200 tons.

Aired: 02/18/14

Rating: NR

The full episode is no longer available for online streaming. Why?

Please continue to enjoy extra(s) from this episode. The full episode is still available for purchase through the "Buy Now" links.

Problems Playing Video?

Corporate sponsorship for American Experience is provided by Liberty Mutual Insurance and Consumer Cellular. Major funding by the Alfred P. Sloan Foundation.